4Woods

Japanese silicone dolls Made by 4 Woods

Builders

I’m having my kitchen renewed. But before they are able to have the new stuff installed, there’s a lot of preparation to be done. Walls have to be plastered, the floor needs to be tiled, the fuse box has to be replaced, the heating system amended, and there’s plumbing to be done. So I had to contract builders to get it all done.

Pages